Архитектура-(3434)Астрономия-(809)Биология-(7483)Биотехнологии-(1457)Военное дело-(14632)Высокие технологии-(1363)География-(913)Геология-(1438)Государство-(451)Демография-(1065)Дом-(47672)Журналистика и СМИ-(912)Изобретательство-(14524)Иностранные языки-(4268)Информатика-(17799)Искусство-(1338)История-(13644)Компьютеры-(11121)Косметика-(55)Кулинария-(373)Культура-(8427)Лингвистика-(374)Литература-(1642)Маркетинг-(23702)Математика-(16968)Машиностроение-(1700)Медицина-(12668)Менеджмент-(24684)Механика-(15423)Науковедение-(506)Образование-(11852)Охрана труда-(3308)Педагогика-(5571)Полиграфия-(1312)Политика-(7869)Право-(5454)Приборостроение-(1369)Программирование-(2801)Производство-(97182)Промышленность-(8706)Психология-(18388)Религия-(3217)Связь-(10668)Сельское хозяйство-(299)Социология-(6455)Спорт-(42831)Строительство-(4793)Торговля-(5050)Транспорт-(2929)Туризм-(1568)Физика-(3942)Философия-(17015)Финансы-(26596)Химия-(22929)Экология-(12095)Экономика-(9961)Электроника-(8441)Электротехника-(4623)Энергетика-(12629)Юриспруденция-(1492)Ядерная техника-(1748)

Force Majeure




Sanctions

Insurance

Indemnity

 

10.1. The Supplier shall indemnify the Company against any loss, damage or injury to the Company, and claim in respect of loss, damage or injury made against the Company by third parties and any costs and expenses arising in connection with them which result from the Supplier’s failure to comply with the Contract (whether negligent or otherwise) and in particular resulting from any defect in the Goods or their materials, construction, workmanship or design (to the extent that the Supplier is responsible for design) or any claim that any Goods prepared or supplied under the Contract otherwise than exclusively in accordance with a design or instruction given by the Company infringe or are alleged to infringe the rights of any third party claimed under or in connection with any patent, registered design, copyright or breach of confidence.

10.2. The Supplier shall be at all times adequately insured with a reputable insurer against all insurable liability under the Contract.

10.3. The Supplier shall provide all facilities, assistance and advice required by the Company or its insurers for the purpose of contesting or dealing with any action, claim or matter arising out of the Supplier's performance or purported performance of or failure to perform the Contract.

Example 3.

 

The Buyer will insure at his expense all the equipment for its full value against all usual marine risks from the moment the goods are put on board at the port of loading.

 

 

6.1. In the event of the Seller's delay in the supply against the dates stipulated in the Contract the Seller is to pay to the Buyer penalty at the rate of 0,5 % of the value of goods not delivered in due time for every week of the delay within the first four weeks and 1% for every subsequent week but not more than 10% of the value of the equipment not delivered in due time.

6.2. The penalties will be deducted from the Seller’s invoices when they will be paid by the Buyer. In case the Buyer for any reason does not deduct the penalty when paying the Seller’s invoice the latter is obliged to pay the penalty at the first request of the Buyer.

6.3. Should the delay in delivery exceed four months the Buyer shall have the right to cancel the Contract or a part thereof.

6.4. Should the shipment of the equipment not be notified or be notified with delay, the Seller is to pay to the Buyer penalty at the rate of 0,1% of the value of the equipment already shipped.

 

 

Example 4.

 

7.1. Seller shall not be liable for any loss or damage to Buyer by reason of delay in performance, or non-performance of any obligations under this Agreement, resulting from force majeure circumstances such as war, riot, fire, explosion, flood, strike, labor interruption or disturbance, lockout, injunction, government action, inability to obtain fuel, electrical power, raw materials, material in intermediate or finished form, labor, containers, or transportation facilities, accident, breakage of machinery or apparatus, national emergency, natural disasters, blockades, prohibition of export / import activities or any other causes beyond the control of Seller preventing the manufacture or delivery of the Products. In such circumstances, deadlines to be met by either party are deferred as long as such circumstances last. Seller reserves the right during the period of shortage due to any of said causes to allocate its available supplies among any or all purchases, as well as departments and divisions of Seller on such basis as it may equitable, without liability for any failure of performance or delay in performance which may result therefrom.

7.2. The Party which is unable to fulfil the obligation due to force majeure circumstances shall immediately inform in writing the other Party about such force majeure circumstances and about its termination.

Example 5.




Поделиться с друзьями:


Дата добавления: 2014-12-23; Просмотров: 658; Нарушение авторских прав?; Мы поможем в написании вашей работы!


Нам важно ваше мнение! Был ли полезен опубликованный материал? Да | Нет



studopedia.su - Студопедия (2013 - 2024) год. Все материалы представленные на сайте исключительно с целью ознакомления читателями и не преследуют коммерческих целей или нарушение авторских прав! Последнее добавление




Генерация страницы за: 0.008 сек.