Студопедия

КАТЕГОРИИ:


Архитектура-(3434)Астрономия-(809)Биология-(7483)Биотехнологии-(1457)Военное дело-(14632)Высокие технологии-(1363)География-(913)Геология-(1438)Государство-(451)Демография-(1065)Дом-(47672)Журналистика и СМИ-(912)Изобретательство-(14524)Иностранные языки-(4268)Информатика-(17799)Искусство-(1338)История-(13644)Компьютеры-(11121)Косметика-(55)Кулинария-(373)Культура-(8427)Лингвистика-(374)Литература-(1642)Маркетинг-(23702)Математика-(16968)Машиностроение-(1700)Медицина-(12668)Менеджмент-(24684)Механика-(15423)Науковедение-(506)Образование-(11852)Охрана труда-(3308)Педагогика-(5571)Полиграфия-(1312)Политика-(7869)Право-(5454)Приборостроение-(1369)Программирование-(2801)Производство-(97182)Промышленность-(8706)Психология-(18388)Религия-(3217)Связь-(10668)Сельское хозяйство-(299)Социология-(6455)Спорт-(42831)Строительство-(4793)Торговля-(5050)Транспорт-(2929)Туризм-(1568)Физика-(3942)Философия-(17015)Финансы-(26596)Химия-(22929)Экология-(12095)Экономика-(9961)Электроника-(8441)Электротехника-(4623)Энергетика-(12629)Юриспруденция-(1492)Ядерная техника-(1748)

Optimal time budget, one person - ANFO: 3 x 600kg, PA: 3 x 0,5kg, DDNP: 3 x 10g




 

If I had known then, what I know today, by following this guide, I would have managed to complete the operation within 30 days instead of using almost 80 days. By following my guide, anyone can create the foundation for a spectacular operation with only 1 person in less than a month even if adding 2 "resting" days!:-)

 

Day 1: Moving and getting your equipment and gear into place.

Day 2: Installing all equipment - fume hood, fan etc.

Day 3: Finishing the metal skeletons/cylinders for the blast devices and completing other practical issues relating to gear and equipment.

Day 4: Creating an evacuation/emergency strategy, packing an evacuation kit (survival gear etc.)

Day 5: Grinding 2,5kg of aspirin: 30 minutes with blender, manufacture of acetylsalicylic acid from aspirin (4 hours) + drying in oven (4 hours per batch x 3)

Day 6: Manufacture of acetylsalicylic acid from aspirin (4 hours) + drying in oven (4 hours per batch x 3)

Day 7: Boiling sulfuric acid using 4 cooking plates outside, from 23.00-07.00, 15-18L->5L of 90%+

Day 8: Boiling sulfuric acid using 4 cooking plates outside, from 23.00-07.00, 15-18L->5L of 90%+

Day 9: Creating Picric Acid (6 out of 12 batches using 3 x hot plate stirrers)

Day 10: Creating Picric Acid (12 out of 12 batches using 3 x hot plate stirrers). Completed

Day 11: Purification of Picric Acid

Day 12: Purification of Picric Acid

Day 13: Purification of Picric Acid. Completed

Day 14: Creating DDNP

Day 15: Creating DDNP. Completed

Day 16: Relocation of 27-0-0 fertilizer. Break down a 600kg bag into 13-14 x 50kg bags, load in the truck, drive to location where you are going to crush them if needed.

Day 17: Relocation of fertilizer. Break down another 600kg bag into 13-14 x 50kg bags.

Day 18: Relocation of fertilizer. Break down the last 600kg bag into 13-14 x 50kg bags.

Day 19: Initiate fertilizer grinding phase using 4 stationary blenders simultaneously. It will take aprox. 30-40 minutes to complete a full 50kg bag of ANFO, including the addition of the diesel and sealing the inner and outer bag with pieces of duct tape. It should be done nighttime between 23.00-07.00 as its quite noisy. The task also includes filling 20L plastic containers with diesel, and then breaking each 20L container down to 4L containers (empty distilled water containers) Complete 9 x 50kg bags of ANFO.

Day 20: Complete 9 x 50kg bags of ANFO.

Day 21: Complete 9 x 50kg bags of ANFO.

Day 22: Complete 9 x 50kg bags of ANFO. Completed.

Day 23: Mix in 2,5% (by weight) micro balloons and 10-15% (by weight) aluminium powder into the now hardened ANFO.

Day 24: Mix in 2,5% micro balloons and 10-15% aluminium powder into the now hardened ANFO.

Day 25: Mix in 2,5% micro balloons and 10-15% aluminium powder into the now hardened ANFO.

Day 26: Prepare trucks for transportation.

Day 27: Prepare trucks for transportation.

Day 28: Prepare trucks for transportation.

Day 29: Completed

 

The following chart illustrates labour required vs. risk of apprehension for individuals who are NOT already on any watch list.

 

 

Risk vs. Labour Time required to complete Risk of apprehension
  1 person   30 days   30%
2 people 20 days 60%
3 people 16 days 85%
4 people 13 days 90%
5 people 12 days 90-95%

 

 

The old saying; "if you want something done, then do it yourself" is as relevant now as it was then. More than one "chef" does not mean that you will do tasks twice as fast. In many cases; you could do it all yourself, it will just take a little more time. AND, without taking unacceptable risks. The conclusion is undeniable.

 

 

I believe this will be my last entry. It is now Fri July 22nd, 12.51.

 

Sincere regards,

 

Andrew Berwick

Justiciar Knight Commander

Knights Templar Europe

Knights Templar Norway

 

 

Further studies

 

 




Поделиться с друзьями:


Дата добавления: 2015-05-31; Просмотров: 320; Нарушение авторских прав?; Мы поможем в написании вашей работы!


Нам важно ваше мнение! Был ли полезен опубликованный материал? Да | Нет



studopedia.su - Студопедия (2013 - 2024) год. Все материалы представленные на сайте исключительно с целью ознакомления читателями и не преследуют коммерческих целей или нарушение авторских прав! Последнее добавление




Генерация страницы за: 0.011 сек.