Архитектура-(3434)Астрономия-(809)Биология-(7483)Биотехнологии-(1457)Военное дело-(14632)Высокие технологии-(1363)География-(913)Геология-(1438)Государство-(451)Демография-(1065)Дом-(47672)Журналистика и СМИ-(912)Изобретательство-(14524)Иностранные языки-(4268)Информатика-(17799)Искусство-(1338)История-(13644)Компьютеры-(11121)Косметика-(55)Кулинария-(373)Культура-(8427)Лингвистика-(374)Литература-(1642)Маркетинг-(23702)Математика-(16968)Машиностроение-(1700)Медицина-(12668)Менеджмент-(24684)Механика-(15423)Науковедение-(506)Образование-(11852)Охрана труда-(3308)Педагогика-(5571)Полиграфия-(1312)Политика-(7869)Право-(5454)Приборостроение-(1369)Программирование-(2801)Производство-(97182)Промышленность-(8706)Психология-(18388)Религия-(3217)Связь-(10668)Сельское хозяйство-(299)Социология-(6455)Спорт-(42831)Строительство-(4793)Торговля-(5050)Транспорт-(2929)Туризм-(1568)Физика-(3942)Философия-(17015)Финансы-(26596)Химия-(22929)Экология-(12095)Экономика-(9961)Электроника-(8441)Электротехника-(4623)Энергетика-(12629)Юриспруденция-(1492)Ядерная техника-(1748)

Site Programming




Прочитайте текст и выполните задании.

Переведите интернациональные слова.

TEXT D

Соедините части предложений и продолжите мысль.

A site design...

>...should be conducted for the contractor.

>...appears to be quite tangled and challenging task.

>...is not arbitrary.

>...includes considerations of the intention of the project.

>...must retain functional elements of broad environment to be sustainable.

>...should be functional and constructed of durable materials.

>...is neither a land use plan nor an abstract relational diagram.

 

7. Сформулируйте своё определение понятия "design".


stage, process, location, context, legal, circulation, initial, schematic, study, type, priority, parallel, necessary, natural, activity, integrity, regulation, precedence, identify, engineer.

2. Запомните слова и словосочетания.

3. organizational stage — организационная стадия;

4. legal elements — правовая (юридическая) часть;

site programming— проект организации строительства;

cost estimate — оценка затрат (на строительство);

process of refinement— корректировка, усовершенствование;

required facilities — необходимое оборудование, сооружения;

time of completion — время завершения (строительства);

work task — рабочее задание;

scheduling of activities — составление графика работ;

precedence -— приоритет, первоочерёдность;

structural integrity — конструктивная целостность;

technical requirements — технические требования, условия;

recommended specifications — рекомендованные технические ус­ловия;

construction equipment— строительное оборудование.

The site design and site planning process begins with the initial problem to be solved. Site planning refers to the organizational stage of the design process. It is divided into three phases: research, analy­sis, and synthesis, and involves location, neighborhood and zoning contexts, natural physical features, legal elements, circulation, drai­nage, utilities, etc.

The next step involves programming the site. [From the analysis, a program is developed dealing with schematic design of a site plan as well as a preliminary cost estimate for the site.]0

Program development is based on the study of factors such as site requirements and sizes, types of building and site construction, and the

52

uses of materials. The program is a constant process of refinement as these factors are studied. [The completely developed program will include a schedule of required facilities, their times of completion, and their priority for construction.]0

A parallel step in the planning process is to define the various work tasks that must be accomplished. [These work tasks represent the ne­cessary framework to permit scheduling of activities, estimating the resources required, and necessary precedences among the tasks.]0 Precedence relations between activities signify that the activities must take place in a particular sequence. Numerous natural sequences exist for construction activities due to requirements for structural in­tegrity, regulations, and other technical requirements.

[Choice of appropriate technology involves study on methods of construction to successfully achieve the structural design with rec­ommended specifications.]0 It also includes study on construction equipments and temporary works required to facilitate the construc­tion process.

[The civil/site engineer is typically responsible for surveying the site and identifying all existing structures and proposed construction on drawings.]0

(1 600 п.зн.)

 




Поделиться с друзьями:


Дата добавления: 2014-12-29; Просмотров: 502; Нарушение авторских прав?; Мы поможем в написании вашей работы!


Нам важно ваше мнение! Был ли полезен опубликованный материал? Да | Нет



studopedia.su - Студопедия (2013 - 2024) год. Все материалы представленные на сайте исключительно с целью ознакомления читателями и не преследуют коммерческих целей или нарушение авторских прав! Последнее добавление




Генерация страницы за: 0.006 сек.